Sign In | Join Free | My burrillandco.com
Home > Mechanized Bridge >

Bridge Length 21m Military Temporary Bridge Erection Time 10min

CHINA HARZONE INDUSTRY CORP.,LTD.
Trust Seal
Verified Supplier
Credit Check
Supplier Assessment
Contact Now
    Buy cheap Bridge Length 21m Military Temporary Bridge Erection Time 10min from wholesalers
     
    Buy cheap Bridge Length 21m Military Temporary Bridge Erection Time 10min from wholesalers
    • Buy cheap Bridge Length 21m Military Temporary Bridge Erection Time 10min from wholesalers

    Bridge Length 21m Military Temporary Bridge Erection Time 10min

    Ask Lasest Price
    Brand Name : Harzone
    Payment Terms : According to detailed order
    Delivery Time : negotiation
    • Product Details
    • Company Profile

    Bridge Length 21m Military Temporary Bridge Erection Time 10min


    Bridge Length 21m Erection Time 10min Mechanical Bridge


    Bridge Length 21m Erection Time 10min Mechanical Bridge is sort of emergency equipment carried by automobile and accomplishes erection and retrieval by erection vehicle. It is mainly used to erect a bridge with a length of 21m long and a width of 3.3m to ensure all sorts of vehicles with a tracked load of up to 60 tons or an axle load of up to 17 tons to go across small medium rivers and dry gaps rapidly.

    NoItemData
    1Total weight≤32t
    2Outline dimension (L×W×H)13m×3.32m×3.6m
    3Load capacity
    Tracked Load60t
    Wheeled Load17t
    4Span weight10.5t
    5Bridge length21m
    6Erection time10min
    7Retrieval time10min
    8Max. longitudinal slope±10%
    9Max. lateral slope±5%
    10Allowed bank differences±2.0m
    11Operators2~3
    12Max. speed85 km/h

    Basic composition of Bridge Length 21m Erection Time 10min Mechanical Bridge

    Bridge Length 21m Erection Time 10min Mechanical Bridge is mainly composed of span, chassis and auxiliary equipment. The span is folded on the chassis when transportation and erected by chassis. The auxiliary equipment is used to help with erecting and fixing.


    Pictures of Bridge Length 21m Erection Time 10min Mechanical Bridge


    FAQ

    1,How about quality control of your company?

    Manufacturing process for steel bailey bridge in China,who has engaging in this line for over 50 years with an International Quality System Certification of ISO 9001:2015 and as cooperation partner with the research institutions of the People’s Liberation Army. And our products have been exported to more than 40 countries and regions in Asia,Africa,Latin America and Oceania.


    2,Are you a factory or a trade company?

    We are a factory with 8 production lines and various machines to fabricate steel bridge parts,pontoon bridges,mechanized bridges and other products.Also, we have get the exporting license to devote ourselves into global market.


    3,Where is your loading port?

    Shanghai Port,Nanjing Port,Tianjin Port.

    Quality Bridge Length 21m Military Temporary Bridge Erection Time 10min for sale
    Inquiry Cart 0
    Send your message to this supplier
     
    *From:
    *To: CHINA HARZONE INDUSTRY CORP.,LTD.
    *Subject:
    *Message:
    Characters Remaining: (0/3000)
     
    Find Similar Products By Category: